山东电力建设第三工程有限公司-pg电子游戏试玩平台网站

welcome to sepcoiii !

dubai aluminum ccpp project successfully completed 30 days of reliable operation

2021-8-24 17:20:11

at 10:50 of august 22, local time, dubai aluminum ccpp project successfully completed 30 days of reliable operation.

before the reliability operation started, the project team meticulously planned and deployed carefully, and formulated detailed safety during the reliability test. after the unit was fully loaded for the first time, it only took 4 days to start reliable operation. during reliable operation, the instrument input rate, automatic input rate, and protection input rate of the main engine and all auxiliary systems of the whole plant have been maintained at 100% without any manual intervention. the accuracy and stability of the unit’s automation control have withstood the full test, especially during the start-stop, load disturbance and other operations of the unit according to the owner’s requirements, the excellent performance of the unit has been highly recognized by the owner.




网站地图